Home › Sussex & Kent › Yalding to Allington
Yalding to Allington
Beginner · 9.4 miles (15.2 km) · about 4 hours · Sussex & Kent
The lower half of the Medway Canoe Trail, past Teston and East Farleigh and through Maidstone to the tidal limit at Allington Lock.
- Start
- Yalding, Hampstead Lane Public
- Finish
- Allington Lock Public
Watch for
- Register first: EA registration or Paddle UK membership.
- Hampstead Lock: canoe portage platform on your right.
- Teston Lock: keep off the weir.
- East Farleigh: paddle through the bridge arches to reach the portage platform.
- Finish on the slipway on your left at Allington, by the timber-clad boaters' building. Don't go below the lock: the river is tidal.
Call 999
Ask for: Fire and Rescue (and Ambulance if anyone is hurt)
Pollution, wildlife and local contacts
Pollution, sewage, dead fish: Environment Agency incident hotline
0800 80 70 60Injured or trapped wild animal: RSPCA
0300 1234 999Environment Agency (Medway navigation)
0800 80 70 60Water today: example only, not live